Papieri Cham

Where paper was once produced along the waters of the Lorze for over 360 years, a completely new residential quarter with around 1,000 apartments and 1,000 jobs is being built on eleven hectares in six construction phases over a period of around ten years.

Back

1
Papieri Cham

Alpnach Schränke AG was commissioned to supply 237 cabinet items for construction area A, which was divided into eight construction phases. These included checkroom lockers and lockers in which ventilation ducts or wash towers were integrated. The attic floors were designed with a room height of three meters. For the effective cupboard height of 2.73 m plus plinth and panels, the maximum possible height was produced from the standard U570 VL decor panels.

Our road trains - trucks with trailers - delivered the material to the construction site in 16 stages.

On average, three fitters were on the job for almost three months and spent around 1,100 hours (134 working days) assembling cabinets.

Papieri Cham

Some figures about the property

Rental apartments 163
Owner-occupied apartments 61
realized cabinet positions 237
Number of pallets of material delivered 200
Number of load trains with material to the construction site 16

Papieri Cham
Papieri Cham
Construction phase E

Construction phase E

We are delighted that construction stage E has already been installed using alpnach norm products. A big thank you to the client for choosing alpnach norm once again.

Oscar Rodriguez
Exhibition Manager / Project Manager Sales, Alpnach Schränke AG

Benefit from our individual advice

Our customer advisors will be happy to support you with valuable information, ideas and tips. Work with us to plan and design your individual dream products tailored to your needs and budget.

Custom-made shelving Custom-made wardrobe Built-in wardrobe Dressing room Walk-in closet Built-in cabinet Custom-made built-in wardrobe Double door cabinet Custom-made wardrobe Custom-made shoe cabinet Fold-away bed & bed cabinet